Working together from design to handover
The distribution centre is well positioned for logistics operations to and from the Port of Antwerp. Building contractor MarQant constructed the facility in close collaboration with MI Groep, which was responsible for all building services installations.
MI Groep and Luminaid worked together on the lighting design, manufacture, installation and handover. The result is a DATALUX continuous linear lighting system spanning around 4 kilometres.
Uniform illumination across the warehouse
The continuous lighting runs provide uniform illumination throughout the warehouse, supporting day-to-day work in the distribution centre. The low connected load also limits the electrical power required for the lighting installation.
Emergency lighting within the system
The installation also includes the DCEM30 emergency lighting system. In the event of a mains power failure, it provides emergency illumination through the line lighting, helping occupants find their bearings and identify the escape route.